Hampshire

Enabling works and roadways

sector
Industrial and Technical
form of contract
NEC
service
Civils
duration
25 weeks
value
£2.5m
location
Hampshire

Working on an existing partially developed location, we were contracted to provide infrastructure installations to facilitate the future development of the overall site.

The installation of roadways and drainage infrastructure, following site clearance, was achieved in tandem with the ongoing development works on this prestigious site.

Key facts
m3 of recycled material used
m of storm drainage
m2 of permeable paving

Taking a site-wide and forward-thinking approach to the construction and design of this project was key in ensuring that these works could be delivered with minimal disruption to existing operations, with an eye on the changing requirements of the site based upon market demand.

With ecological constraints being key, our team worked through an evolving scheme to ensure that planning conditions were met without reducing the overall success of this project.

Working closely with the client and other stakeholders, we delivered this project by utilising a flexible and collaborative approach, which contributed to the ongoing success of the site-wide scheme as a whole. Our approach ensured the future-proofing of our client’s long term market requirements.